I’ve been a major slacker on the bathroom updates for the past few days. SORRY! Tiling began sometime late last week. The huge 12 x 24 tiles needed to be installed a few days at a time because the sheer weight of them just kept them from being done all at once — plus they’re a 1/2″ thick! What the hell was I thinking?! Lesson learned there! Also, the girl at the tile shop didn’t order enough grout for the wall, so I was lucky enough to borrow from someone else’s order (they didn’t need it right away)!

So since my last post, the guy put in the baseboard tiles, finished installing the ceiling fan, and tiled the backsplash and wall. Enjoy a few pics!

Remodel Day 13
The backsplash tiles went in first to set the height for everything else.

Remodel Day 13
Ginormous 12×24 wall tiles. The idea was to have less grout to clean… now I’m not entirely sure it was a good idea.


Remodel Day 13

Day 14 and the first round of wall tiles.

Remodel Day 14
Day 15: the wall tiles are in… mostly. Alcove still needs to be done in this pic.

Remodel Day 14
The fan opening.

Remodel Day 16
Day 16 and grouting has begun. Check out the nifty piece of molding I suggested he make for the backsplash. I think it looks nice.

Remodel Day 16
The grout makes the brick pattern disappear, but that doesn’t really bother me.

Remodel Day 16
I love these tiles so much.